Installation Safety Guide for Aluminum Alloy Sandwich Panel

The installation quality of aluminum alloy sandwich panels directly affects their insulation effect and service life. This article details the standard installation process to help construction personnel operate in a standardized manner and ensure engineering quality and safety.
I. Pre-construction Preparation
1. Check the flatness and strength of the base roof/wall to ensure it meets installation requirements.
2. Calculate the required number and specifications of panels according to design drawings, reserving 5% loss margin.
3. Prepare installation tools: electric drill, self-tapping screws, sealant, cutting machine, etc.
4. Check panel appearance to confirm no damage, deformation and other quality issues.
II. Installation Process
1. Start from one end of the roof/wall, lay panels in sequence along the horizontal direction.
2. Panels use tongue-and-groove connection to ensure tight joints.
3. Fix with special self-tapping screws, screw spacing not exceeding 300mm.
4. Apply special sealant at joints to ensure waterproof performance.
5. Use edge strips for edge treatment.
III. Precautions
1. Pay attention to panel direction during installation to ensure correct drainage slope of sandwich panel type.
2. Use special cutting tools when cutting panels to avoid damaging core material.
3. Suspend construction in rainy or windy weather to ensure construction safety.
4. Conduct waterproof test after installation to confirm no leakage.
IV. Quality Acceptance
After installation, conduct quality acceptance according to relevant standards, focusing on checking fixing firmness, joint sealing, surface flatness and other indicators.